1. Сафага промисловий порт.
|
Project Name |
Safaga Industrial Port |
|
Tendering Authority |
The Executive Organization For Industrial & Mining Projects / Ministry of Industry & Foreign Trade |
|
Project Objectives |
The establishment of a number of value-added industrial and logistics’ projects the use of surplus of the current berth productivity and the unused yards inside the port which is estimated by 719 000 m2. These projects will be selected according to the needs of the direct and outer hinterland (South Valley governorate), and the economic projects’ need that will be established in the national project of the Golden triangle. |
|
Project Description |
Development & Upgrade of Safaga mining port that includes a platform for exporting crude Phosphate to be an Industrial Port through establishment of 2 industrial zones to establish a number of value-added industrial projects that will be needed for the port direct and outer hinterland, with the availability of logistic services (transport, sorting, storage, quality tests, packing) as follows: - Liquid bulk terminal. - Livestock terminal with meat processing facilities. - Grain storage and milling terminal |
|
Pre-feasibility Studies’ Consultants |
HPC Hamburg Port Consulting GmbH |
|
Pre-feasibility Studies financed by: |
Arab Financing Facility for Infrastructure (AFFI) |
|
Project Structure |
Private sector role: Construct, manage, operate & maintain the and handover the first industrial zone after contract duration |
|
Public sector role: presenting government role in monitoring, supervision and applying related laws and ministerial decrees. |
|
|
Investment Costs |
100 Million USD |
|
Time Table |
|
- 2. Каїр Контактний центр Парк (КТС)
|
Project Name |
Cairo Contact Centers Park (CCC) |
|
Tendering Authority |
The ministry of Communications and Information Technology (MCIT). |
|
Project Objectives |
Achieve the integration with the plan of Ministry of Communications and Information Technology (MCIT) by spreading geographically (East Cairo) for the deployment of clusters specialized in the manufacture of communications and information technology after the success story of the Smart Village (west of Greater Cairo) as development of a national project aims to the exports development of Egypt for telecommunications services industry, information technology and outsourcing industry. Put Egypt on the global map of telecommunications services and information technology and provides value-added export of approximately ($ 1.2 billion per year) in the field of outsourcing when it is completed. |
|
Project Description |
The investment will start in the second quarter of 2014 through three stages and ending in 2017. It will include the usufruct of lands with a total area of 39,000 m2 for the construction of 27 buildings on 3 stages with total land areas of (1300-1400 m2) per piece to the Egyptians, Arabs and foreigners investors. |
|
Pre-feasibility Studies’ Consultants |
Financial consultant: Young & Ernest Technical consultant: WSP Middle East Legal consultant: Trowers & Hamlins |
|
Pre-feasibility Studies financed by: |
International Finance Corporation (IFC) |
|
Project Structure |
Private sector role: Design, Construct, Finance, Operate & maintain |
|
|
Public sector role: Provide project land and presenting government role in monitoring, supervision and applying related laws and ministerial decrees. |
|
Investment Costs |
Approximately 100 Million USD for the first stage. |
|
Time Table |
|
- 3. Суецький канал спеціалізована Університетська лікарня
|
Project Name |
Suez Canal Specialized University Hospital |
|
Tendering Authority |
Ministry of Higher Education / Suez Canal University |
|
Project Objectives |
The Suez Canal University aims to provide and upgrade specialized clinical and educational services according to the international standards and medical codes, also to resupply the shortage in the vital services such as intensive care, neonatal ICU and advanced clinical services such as neurosurgery and vascular surgery. Suez Canal University Hospital serves five Governorates in Egypt (Port Said, Ismailia and Suez and the North Sinai, South Sinai). |
|
Project Description |
The Suez Canal specialized university hospital was built 9 years ago with the capacity of 230 beds, the University could not operate or refurbish or equip or furnish the building due to the lack of financing. Suez Canal University wishes to tender the hospital building through the PPP Program. |
|
Pre-feasibility Studies’ Consultants |
Technical Consultant: Mott MacDonald |
|
Pre-feasibility Studies financed by: |
Arab Financing Facility for Infrastructure (AFFI) |
|
Project Structure |
Private sector role: Finance, refurbish, Furnish, Equip, maintain and provide non-clinical services as catering, security, cleaning maintenance of the building and equipment, and handover the hospital after contract duration |
|
|
Public sector role: Responsible for the provision of all clinical, educational activities related to the Project and its costs. These include medical consumables, and clinical staff (doctors, nurses, etc.),. The Private sector will receive periodic Service Availability Payments, as well as presenting government role in monitoring, supervision and applying related laws and ministerial decrees. |
|
Investment Costs |
TBD after finalizing the pre-feasibility studies |
|
Time Table |
|
4. Хургада опріснювач
|
Project Name |
Hurghada Desalination Plant |
|
Tendering Authority |
National Authority For Potable Water and Sewage |
|
Project Objectives |
Provide drinking water to meet citizens’ demand in the Governorate |
|
Project Description |
Construction of Hurghada desalination Plant with total capacity of 40,000 M3/day to provide Hurghada with the necessary Water , the plant will be constructed on 2 phases 20,000 m3/day each |
|
Pre-feasibility Studies’ Consultants |
Waiting for allocation of required lands to start tendering and contracting the advisor |
|
Pre-feasibility Studies financed by: |
Agreement With EBRD to Finance the pre-feasibility studies |
|
Project Structure |
Private Sector Role : Design , Finance , construct , operate & maintain the Plant
|
|
|
Public Sector Role : Provide the land of the Project and buy the full production of the plant and presenting government role in monitoring, supervision and applying related laws and ministerial decrees. |
|
Investment Costs |
Will be determined after finalizing the pre-feasibility studies |
|
Time Table |
Estimated to Finalize the pre-feasibility study and begin the tendering procedures is Q3, 2014 |
5. Шарм-ель-Шейх опріснювач
|
Project Name |
Sharm El Sheikh Desalination Plant |
|
Tendering Authority |
National Authority For Potable Water and Sewage |
|
Project Objectives |
Provide drinking water to meet citizens’ demand in the Governorate |
|
Project Description |
Construct of Sharm El sheikh Desalination Plant With total capacity of 20,000 m3/ day |
|
Pre-feasibility Studies’ Consultants |
Waiting for allocation of required lands to start tendering and contracting the advisor |
|
Pre-feasibility Studies financed by: |
Agreement with EBRD to Finance the pre-feasibility studies |
|
Project Structure |
Private Sector Role : Design , Finance , construct , operate & maintain the Plant
|
|
|
Public Sector Role : Provide the land of the Project and buy the full production of the plant and presenting government role in monitoring, supervision and applying related laws and ministerial decrees. |
|
Investment Costs |
Will be determined after finalizing the pre-feasibility studies |
|
Time Table |
Estimated to Finalize the pre-feasibility study and begin the tendering procedures is Q3, 2014 |
6. Геліополіс / Новий Каїр метро
|
Project Name |
Heliopolis / New Cairo Metro |
|
Tendering Authority |
Cairo Governorate |
|
Project Objectives |
Helping in Solving the Traffic & Transportation Problems by using an Unutilized Methods of transportation |
|
Project Description |
Redevelopment of Heliopolis / New Cairo Metro From Heliopolis To 10th District –Nasr city , and establish of a new Metro line to connect between Nasr City and American university in New Cairo City |
|
Pre-feasibility Studies’ Consultants |
Technical Consultant : SNC - Lavalin Legal Consultant: Gide Loyrette |
|
Pre-feasibility Studies financed by: |
World Bank |
|
Project Structure |
Private Sector Role : Construct , Manage, Operate & Maintain of the Project |
|
|
Public Sector Role : Provide the necessary path of the metro line and presenting government role in monitoring, supervision and applying related laws and ministerial decrees. |
|
Investment Costs |
Will be determined after finalizing the pre-feasibility studies |
|
Time Table |
Estimated to Finalize the pre-feasibility study May 2014 Expected time to begin the Tendering procedures is Q3, 2014 |
7. Проект впровадження та автоматизація нотаріальних бюро в Єгипті
|
Project Name |
Rollout & Automation of the Notarization Offices in Egypt Project |
|
Tendering Authority |
Ministry of Justice - Ministry of Communications and Information Technology |
|
Project Objectives |
|
|
Project Description |
|
|
Pre-feasibility Studies’ Consultants |
Ministry of Communications and Information Technology |
|
Pre-feasibility Studies financed by: |
________ |
|
Project Structure |
Private Sector Role : Construct , Execute the engineering works & technology infrastructure, Manage, Operate, Maintain, Training, & follow up the services level of all the offices for Project duration. |
|
|
Public Sector Role: Provide staff from the Ministry of Justice for the notarization process, as determined by the law |
|
Investment Costs |
Approximately 650 Million EGP |
|
Time Table |
|